This project required demolishing the full interior of the building. The only thing that was remaining from the old house was the external wall.
We had to remove all the internal walls and floors leaving only the outside walls. With collaboration with structural engineers we've installed all the required seel work into the house, gradually rebuilding it floor by floor. Once this stage was completed we were able to create floors, walls and the roof.